Tap Water Purification in Guangdong

Category:


summary:3,000t/d SUF (Submerged Ultrafiltration)

Capacity: 3,000 t/d

Process: SUF (Submerged Ultrafiltration)

Effluent Water Quality: Compliant with "Standards for Drinking Water Quality" (GB 5749-2022)

Project Date: January 2025

Highlights: 

→ Water purification for potable water compliance at 2 water plants in Meizhou, Guangdong. The membrane system utilizes gravity-fed constant-pressure filtration, with backup self-priming pump.

→ The designed operational flux of 90 LMH, backwash cycle of 120 Minutes.

→ Based on the design philosophy of energy conservation and emission reduction, it saves 60% in chemical consumption and 50% in energy consumption compared to conventional water plants.

→ To date, the system has been operating stably for 6 months, turbidity <0.2 NTU (consistent standard compliance), used for resident drinking water.

→ Both projects have been promoted as a local showcase/reference project.

Popular Applications